Work continues on the South side of Main as a portion of the parking is removed.
Crews are prepping 9th street for cement.
- October 6th, 2010
Today crews start the removal and replacement of the sidewalk on the south side of Main Street.
The parking area will be removed first. That area will then be poured back with new concrete and matched to the existing brick street.
Then the sidewalk section next to the buildings will be removed and replaced. There will be access to the building at all times. The contractor has bridges he will use to ensure this will happen.
- October 4th, 2010
Crews should be laying the bricks this week on north side of Main Street.
Rock is being laid along 9th Street. Crews continue to prep 9th for the next phase.
- September 30th, 2010 – Update
Crews are pouring concrete at the corner of 10th and Main and spreading rock on 9th.
- September 29th, 2010
The ground on 9th street is being “tilled” today with white rock in preparation for the next stage.
Warning: Use of undefined constant pagination - assumed 'pagination' (this will throw an Error in a future version of PHP) in /home2/adelblog/public_html/wp-content/themes/DA theme/functions.php on line 1842
Project Photo Gallery
no images were found
The following companies were contracted to provide services during the Brick Street Renovation Project
McClure Engineering Engineers Manatts General Contractor and Concrete Paving Elder Corporation Earthwork, Pipe Hardscape Solutions Brick Installation Absolute Concrete Concrete American Fence Railing Breton Enterprises Electrical Quality Striping Inc., DBA DPLM Pavement Marking Quality Traffic Control Inc. Traffic Control Lenhart Plumbing Water Fountain Rothamel Turf Farms, Inc. Landscaping Soil-Tek Silt Fence Swanson Masonry Masonry